Chapter 27: Sustainability

27.2.10 Roads and Maritime Services Environmental Sustainability Strategy 2015–2019

The Roads and Maritime Services Environmental Sustainability Strategy 2015–2019 (Roads and Maritime 2016) outlines nine sustainability focus areas for integrating sustainability into Roads and Maritime operations and services, and aligns with the Transport Environment and Sustainability Policy Framework (Transport for NSW 2013).

Table 27-2 presents the Roads and Maritime sustainability focus areas and outlines how the project is consistent with these.

Table 27-2 Project consistency with Roads and Maritime sustainability focus areas

 

Sustainability focus area

Comment

Energy and carbon management

An energy efficiency and greenhouse gas emissions strategy would be prepared as part of the project’s Sustainability Management Strategy, as discussed in Chapter 22 (Greenhouse gas). The strategy would identify initiatives to be implemented during design and construction of the project to reduce carbon emissions, energy use and embodied life cycle impacts.

Climate change resilience

A climate change risk assessment has been prepared as part of the environmental impact assessment for the project to identify risks and adaptation opportunities to improve the project’s resilience to future climate change and is included in Chapter 24 (Climate change risk and adaptation).

Air quality

Details of how the project ventilation design ensures that concentrations of air emissions meet NSW, national and international best practice for in-tunnel and ambient air quality are presented in Chapter 9 (Air quality).

Resource use and waste management

During construction of the project, unnecessary resource consumption would be avoided by making realistic predictions of the required quantities of resources such as construction materials. The management of construction waste would include reuse, recycling, and reprocessing of waste, where possible. Further details are provided in Chapter 23 (Resource use and waste minimisation).

Pollution control

An acoustic impact assessment has been prepared for the project to identify and mitigate potential noise impacts (refer to Chapter 10 (Noise and vibration)). An assessment has also been prepared for the project to identify and mitigate potential air quality impacts (refer to Chapter 9 (Air quality)). The EIS includes an assessment of the project’s potential impact on soil and water and is provided in Chapter 15 (Soil and water quality). The project would also include measures for the abatement, avoidance and/or containment of pollution and waste.

Biodiversity

A biodiversity assessment has been prepared for the project to identify and consider measures to avoid and minimise potential impacts on biodiversity. Project impacts would be managed in accordance with the Roads and Maritime Biodiversity Guidelines. Additional detail is provided in Chapter 18 (Biodiversity) and Appendix S (Technical working paper: Biodiversity).

Heritage

Items of Aboriginal and non-Aboriginal heritage significance were identified early in the project design and assessment. Impacts on these items have been minimised, avoided and mitigated where practicable and management measures to be implemented throughout construction of the project have been provided. Refer to Chapter 20 (Non-Aboriginal heritage) and Chapter 21 (Aboriginal heritage). The Technical working paper: Non-Aboriginal heritage and Technical working paper: Aboriginal heritage are provided in Appendix U and Appendix V respectively.

Liveable communities

The project would contribute to reducing traffic on the existing road network and improve connectivity across Sydney (refer to Chapter 8 (Traffic and transport)). The project would provide and facilitate improvements in pedestrian and cyclist connections, creating new active transport linkages and linking existing active transport networks with new connections. The project would also improve the amenity of streetscapes, providing a net increase in publicly accessible open space and creating opportunities for future urban renewal. Additional detail is provided in Chapter 8 (Traffic and transport), Chapter 12 (Land use and property), Chapter 13 (Urban design and visual amenity) and Appendix N (Technical working paper: Active transport strategy).

 Sustainability focus area Comment

Sustainable procurement

A project specific Sustainability Management Plan would be prepared to guide the implementation of sustainability throughout the design and construction phases, and to facilitate the achievement of an ISCA Infrastructure Sustainability (IS) rating of ‘Excellent’ (refer to section 27.3 for discussion of the IS rating scheme).

27.2.11 WestConnex Sustainability Strategy

The WestConnex Sustainability Strategy (Sydney Motorway Corporation 2015) describes how sustainability initiatives are being integrated into the design, construction and operation of projects across the WestConnex program of works. The WestConnex Sustainability Strategy outlines a sustainability vision, commitments, guiding principles, objectives and overarching targets across a range of sustainability themes, and was prepared to align with the Transport for NSW Environment and Sustainability Policy Framework (Transport for NSW 2013) as well as other relevant government sustainability instruments (as described in the sections above).

Due to the large scale of the WestConnex program of works, and because it would be delivered as a series of projects over several years, the WestConnex Sustainability Strategy aims to ensure that sustainability is consistently applied across all projects and teams.

The WestConnex Sustainability Strategy provides a framework for implementing sustainability objectives and targets through the project’s contract requirements, competitive tender evaluation process and project specific sustainability management plans/strategies during the design and construction stage.

The WestConnex Sustainability Framework is shown in Figure 27-1. Details of the project sustainability measures, how the project is consistent with the WestConnex Sustainability Framework, and how the project would meet or, where possible, exceed the objectives and targets outlined in the WestConnex Sustainability Strategy, are summarised in Table 27-3.The measures identified in Table 27-3 include a summary of management measures identified for other technical disciplines, as relevant to sustainability. Environmental management measures for the project are further summarised in Chapter 29 (Summary of environmental management measures).

 

Table 27-3 Project consistency with the WestConnex Sustainability Framework objectives and targets

Sustainability targets

Project consistency

Overarching sustainability objective: Demonstrate sustainability leadership and continual improvement

  •  Achieve an IS rating of at least ‘Excellent’ for the design and construction phases
  •  Prepare quarterly project progress reports and an annual WestConnex Sustainability Report
  •  Annual review of the WestConnex Sustainability Report and WestConnex Environment and Sustainability Policy by Senior Management
  •  Share sustainability knowledge and lessons learnt across WestConnex component projects and other Roads and Maritime projects. Participate in sustainability workshops during design and construction phases and document lessons learnt
  •  Appoint a Sustainability Representative with relevant experience to drive the achievement of sustainability outcomes.
  •  An IS rating of at least ‘Excellent’ would be achieved for the design and construction phases of the project
  •  Quarterly project progress reports and an annual WestConnex Sustainability Report would be prepared during the design and construction phases
  •  Senior Management would review the WestConnex Sustainability Report and WestConnex Environment and Sustainability Policy on an annual basis
  •  During the design and construction phases, knowledge and lessons learnt would be shared across the WestConnex component projects through participation at regular sustainability workshops
  •  The Sustainability Representative would drive the achievement of sustainability outcomes during design and construction phases.

Overarching sustainability objective: Protect and enhance the natural environment and local heritage

  •  Ensure no serious pollution incidents occur during construction
  •  Proactively manage any impacts on flora and fauna in accordance with the Roads and Maritime Biodiversity Guidelines
  •  Heritage items are avoided where possible and proactively managed during construction.
  •  Construction activities would be managed in line with the mitigation measures outlined in this EIS to avoid serious pollution incidents
  •  Development of detailed design would include consideration of biodiversity and heritage values, in order to avoid or minimise potential impacts
  •  The project’s design considers opportunities for an increase in publicly accessible open space, parkland and community uses at the Rozelle Rail Yards site
  •  Easton Park was removed from the project footprint to minimise impacts on open space and heritage, and the Blackmore Park wetland was avoided to minimise potential biodiversity impacts
  •  A biodiversity assessment has been prepared in accordance with the Framework for Biodiversity Assessment (OEH 2014b) and the NSW Biodiversity Offset Policy for Major Projects (OEH 2014c). This considers measures to avoid and minimise impacts on biodiversity in a biodiversity assessment report (BAR)
  •  While the project would have minimal impact on biodiversity, as assessed in Chapter 18 (Biodiversity), project impacts would be managed in accordance with the Roads and Maritime Biodiversity Guidelines. Additional detail is provided in Chapter 18 (Biodiversity) and in Appendix S (Technical working paper: Biodiversity)
  •  The removal of the Camperdown interchange component of the project was influenced

Sustainability targets

Project consistency

by potential impacts on heritage conservation areas and heritage items such as the University of Sydney and Victoria Park (both nominated for state heritage listing) and a locally listed sandstone retaining wall on the northern side of Parramatta Road. Its removal facilitated the realignment of the mainline tunnels, which avoid potential impacts on these items

  •  Items of Aboriginal and non-Aboriginal heritage significance were identified early in the project design and assessment. Impacts on identified items have been avoided and mitigated where practicable and management measures would be implemented throughout construction to minimise unavoidable impacts of the project, as described in this EIS
  •  An assessment of potential impacts and proposed mitigation and management measures with regards to non-Aboriginal and Aboriginal heritage are provided in Chapter 20 (Non-Aboriginal heritage) and Chapter 21 (Aboriginal heritage) respectively. The Technical working paper: Non-Aboriginal heritage and Technical working paper: Aboriginal heritage are provided in Appendix U and Appendix V respectively.

    A discussion of refinements to the project design and a description of alternatives are provided in Chapter 4 (Project development and alternatives).

Overarching sustainability objective: Contribute to liveable communities (ease congestion, connect communities, integrate land use and transport planning and facilitate urban revitalisation)

  •  Design the motorway to reduce road congestion and travel times
  •  Ensure appropriate air quality outcomes. The tunnel ventilation systems for the WestConnex program of works would be designed and operated to comply with best practice criteria for in-tunnel and ambient air quality
  •  Maintain or improve pedestrian and cyclist paths and connections
  •  Create/enhance public open space.
  •  The project would contribute to reducing traffic on the existing road network and increasing road capacity and travel times on certain roads
  •  The project would link the M4 East and the New M5, improving connectivity across Sydney
  •  The project would facilitate improvements to the broader road network as part of ongoing network evaluations to manage traffic congestion on local roads
  •  Consideration has been given to the potential traffic changes resulting from the project to ensure that the project is effectively integrated with the road network. Refer to Chapter 8 (Traffic and transport) for more information
  •  Details of how the project ventilation design ensures that concentrations of air emissions meet NSW, national and international best practice for in-tunnel and ambient air quality are presented in Chapter 9 (Air quality)
  •  The project would provide and facilitate improvements in pedestrian and cyclist connections, linking existing connections by integrating the Iron Cove active transport network with a dedicated active transport corridor along Victoria Road, and creating new pedestrian and cyclist links within the Rozelle Rail Yards for connection to the

Sustainability targets

Project consistency

Bays Precinct and the Sydney CBD

  •  The project would increase active transport connectivity as discussed in Appendix N

    (Technical working paper: Active transport strategy), and would capitalise on the reduction in traffic to improve the amenity of local streets for pedestrians and cyclists, including:

    • –  Across the intersection of City West Link and The Crescent, providing improved access to the Rozelle Bay light rail stop
    • –  Through Rozelle Rail Yards, in a north–south direction linking Easton Park and Bicentennial Park, and from east–west to provide connection between the proposed Lilyfield Road Regional Bike Route and The Bays Precinct
    • –  A connection along Victoria Road to the existing Iron Cove active transport network
    • –  New connections through the St Peters interchange (that would be delivered as

      part of the New M5 project)

  •  The Iron Cove Link masterplan and Rozelle Rail Yards masterplan are discussed in Chapter 13 (Urban design and visual amenity) and Appendix L (Technical working paper: Urban design). Potential traffic and active transport impacts are discussed in Chapter 8 (Traffic and transport) and Appendix H (Technical working paper: Traffic and transport) and an active transport strategy report is provided in Appendix N (Technical working paper: Active transport strategy)
  •  A commitment has been made that the project would provide new open space for the community (up to 10 hectares), including areas of open space within the Rozelle Rail Yards
  •  New open space would be provided at St Peters as part of the New M5 project, which would, in addition to the landscaping that would be carried out as part of the project at this location, result in a substantial amount of open space being created by the WestConnex program of works
  •  The types of recreational uses for the new open space generated by the project would be decided in consultation with local communities, UrbanGrowth NSW and relevant councils during detailed design and documented in an Urban Design and Landscape Plan.

    A discussion of usage options for residual land is provided in Chapter 12 (Land use and property).

Sustainability targets

Project consistency

Overarching sustainability objective: Optimise resource efficiency (materials, energy, water, land) and waste management

Materials:

  •  Identify and implement opportunities to reduce material use

    and maximise the use of materials with low environmental

    impact

  •  Maximise the use of timber products from either

    reused/recycled timber or from sustainably managed forests

    that have obtained Forest Management Certification

  •  Optimise the amount of cement replacement material

    (measured by mass) used in concrete

  •  Optimise the amount of recycled material used in road base

    and sub-base.

  •  The use of construction materials to optimise resource efficiency and waste management would be considered in detailed design. Locally sourced materials and prefabricated assets would be selected where possible, to reduce greenhouse gas emissions
  •  In instances where it is cost and performance competitive, recycled products would be used during construction of the project. This would reduce the demand on resources. This may include the use of fly ash and slag within concrete mixes
  •  All wastes would be managed using the hierarchy approach of waste avoidance and waste reuse before consideration of waste disposal
  •  Resource recovery principles would be applied to the construction of the project, including recovery of resources for reuse, recycling and reprocessing, where possible
  •  The project would seek to reuse or recycle at least 95 per cent of uncontaminated spoil generated for beneficial purposes, either within the project or at other locations. A Construction Waste Management Plan would be prepared for the project, detailing appropriate procedures for waste management, as discussed in Chapter 23 (Resource use and waste minimisation)
  •  About 80 per cent of construction and demolition waste is anticipated to be reused and/or recycled as part of the project
  •  During construction, non-potable water sources would be given preference over potable sources where appropriate (see below).

    Additional detail is provided in Chapter 22 (Greenhouse gas) and Chapter 23 (Resource use and waste minimisation).

Energy and carbon:

  •  Prepare an Energy Efficiency and Greenhouse Gas Emissions Strategy detailing processes and methods to improve energy efficiency and reduce greenhouse gas emissions
  •  Percentage of energy sourced from renewable energy generated onsite and/or accredited GreenPower. The current target is to source a minimum of 20 per cent of construction energy and six per cent of operational energy from renewable energy generated onsite and/or accredited GreenPower
  •  Optimise the design and operation of the motorway to minimise energy used by vehicles using the motorway.
  •  A Sustainability Strategy including strategies for energy efficiency and greenhouse gas emissions would be prepared during detailed design. The strategy would identify initiatives to be implemented during construction of the project to reduce carbon emissions, energy use and embodied life cycle impacts
  •  Initiatives would include the selection of energy efficient equipment for tunnelling and construction activities, including the selection of roadheaders for tunnel excavation as opposed to a tunnel boring machine, thereby reducing energy consumption, material use and spoil generation
  •  Where possible, a minimum of 20 per cent of electricity required for construction of the project would be sourced from renewable sources and/or an accredited GreenPower energy supplier. A target minimum of six per cent of construction electricity requirements would be offset, with any offset undertaken in accordance with the Australian Government National Carbon Offset Standard
  • A minimum of six per cent of operational electricity requirements for the project would be sourced from renewable sources and/or an accredited GreenPower energy supplier. Opportunities for operational energy offset, in accordance with the Australian Government National Carbon Offset Standard, would be considered during detailed design.

    Measures to improve energy efficiency are discussed in Chapter 22 (Greenhouse gas) and design development of the project is discussed in Chapter 4 (Project development and alternatives).

Sustainability targets

Project consistency

Overarching sustainability objective: Optimise resource efficiency (materials, energy, water, land) and waste management

Materials:

  •  Identify and implement opportunities to reduce material use

    and maximise the use of materials with low environmental

    impact

  •  Maximise the use of timber products from either

    reused/recycled timber or from sustainably managed forests

    that have obtained Forest Management Certification

  •  Optimise the amount of cement replacement material

    (measured by mass) used in concrete

  •  Optimise the amount of recycled material used in road base

    and sub-base.

  •  The use of construction materials to optimise resource efficiency and waste management would be considered in detailed design. Locally sourced materials and prefabricated assets would be selected where possible, to reduce greenhouse gas emissions
  •  In instances where it is cost and performance competitive, recycled products would be used during construction of the project. This would reduce the demand on resources. This may include the use of fly ash and slag within concrete mixes
  •  All wastes would be managed using the hierarchy approach of waste avoidance and waste reuse before consideration of waste disposal
  •  Resource recovery principles would be applied to the construction of the project, including recovery of resources for reuse, recycling and reprocessing, where possible
  •  The project would seek to reuse or recycle at least 95 per cent of uncontaminated spoil generated for beneficial purposes, either within the project or at other locations. A Construction Waste Management Plan would be prepared for the project, detailing appropriate procedures for waste management, as discussed in Chapter 23 (Resource use and waste minimisation)
  •  About 80 per cent of construction and demolition waste is anticipated to be reused and/or recycled as part of the project
  •  During construction, non-potable water sources would be given preference over potable sources where appropriate (see below).

    Additional detail is provided in Chapter 22 (Greenhouse gas) and Chapter 23 (Resource use and waste minimisation).

Energy and carbon:

  •  Prepare an Energy Efficiency and Greenhouse Gas Emissions Strategy detailing processes and methods to improve energy efficiency and reduce greenhouse gas emissions
  •  Percentage of energy sourced from renewable energy generated onsite and/or accredited GreenPower. The current target is to source a minimum of 20 per cent of construction energy and six per cent of operational energy from renewable energy generated onsite and/or accredited GreenPower
  •  Optimise the design and operation of the motorway to
  •  A Sustainability Strategy including strategies for energy efficiency and greenhouse gas emissions would be prepared during detailed design. The strategy would identify initiatives to be implemented during construction of the project to reduce carbon emissions, energy use and embodied life cycle impacts
  •  Initiatives would include the selection of energy efficient equipment for tunnelling and construction activities, including the selection of roadheaders for tunnel excavation as opposed to a tunnel boring machine, thereby reducing energy consumption, material use and spoil generation
  •  Where possible, a minimum of 20 per cent of electricity required for construction of the project would be sourced from renewable sources and/or an accredited GreenPower energy supplier. A target minimum of six per cent of construction electricity requirements would be offset, with any offset undertaken in accordance with the Australian Government National Carbon Offset Standard

Sustainability targets

Project consistency

minimise energy used by vehicles using the motorway.

A minimum of six per cent of operational electricity requirements for the project would be sourced from renewable sources and/or an accredited GreenPower energy supplier. Opportunities for operational energy offset, in accordance with the Australian Government National Carbon Offset Standard, would be considered during detailed design.

Measures to improve energy efficiency are discussed in Chapter 22 (Greenhouse gas) and design development of the project is discussed in Chapter 4 (Project development and alternatives).

Water:

  •  Undertake a Water Balance Study and identify opportunities to reduce water use (in particular potable water use) and reuse water (eg rainwater, stormwater, wastewater and groundwater) during construction and operation
  •  Reuse, recycle or reclaim water (eg rainwater, stormwater, wastewater, groundwater, tunnel inflow water) generated/collected.
  •  A water balance for surface water for construction and operation of the project is summarised in Chapter 17 (Flooding and drainage) and detailed in Appendix Q (Technical working paper: Surface water and flooding). Refer to Chapter 19 (Groundwater) and Appendix T (Technical working paper: Groundwater) for the detailed groundwater balance
  •  Water efficiency measures would be implemented with a focus on achieving water savings and targeting water recycling and reuse
  •  During construction, non-potable water sources would be given preference over potable sources where appropriate. Water would be sourced from:
    • –  Non-potable sources including stormwater harvesting at construction ancillary

      facilities, and on-site construction water treatment and reuse

    • –  The mains supply (potable water)
  •  The extent to which non-potable water can be used during the project would be reviewed and refined during detailed design
  •  Construction water would either be reused on site wherever feasible, or treated and discharged into the local stormwater system in accordance with the requirements of an Environment Protection Licence
  •  Preference would be given to reusing as much water as practicable before discharging. Additional information regarding surface water and water quality is provided in Chapter 15 (Soil and water quality). Indicative wastewater reuse volumes are provided in Chapter 23 (Resource use and waste minimisation)
  •  The indicative layouts of the temporary construction ancillary facilities have taken into consideration the flood risk posed to the land. This includes identifying opportunities to provide setback from areas at risk of flooding or considering locating uses considered more vulnerable to flooding – such as stockpile areas, storage of chemicals, tunnel dives and deep excavations – away from areas of highest risk. Refer to Chapter 17 (Flooding and drainage) and Appendix Q (Technical working paper: Surface water and flooding) for further detail

Sustainability targets

Project consistency

  •  The layout of the operational sites has taken into consideration the flood risk posed to the sites and how to manage these risks. The process for establishing flood risk for the project is outlined in Chapter 17 (Flooding and drainage). Mitigation measures have already been included as a consequence of the evolution of the concept design, as discussed in Chapter 17 (Flooding and drainage) and Appendix Q (Technical working paper: Surface water and flooding)
  •  The design includes a number of bioretention basins and wetlands, including a 4,300 square metre wetland within the Rozelle Rail Yards site which would receive and treat stormwater runoff from the Rozelle Rail Yards as well as groundwater effluent from the water treatment plant
  •  Opportunities to reuse treated groundwater during project operation would be considered in preference to discharge to the stormwater system or receiving waterbodies. This could include irrigation of landscaped areas within the project such as the new open space at the Rozelle interchange.

Land:

  •  Minimise the project’s surface land footprint and acquisition of properties
  •  Identify contaminated sites within the project footprint and remediate to a standard for post construction use (as applicable).
  •  The project has been designed to maximise the use of land already owned by the NSW Government, and operational elements of the project would be located within existing road corridors as much as feasible
  •  The project has been designed to maximise use of land currently being used for construction of the M4 East and New M5 projects. Additional land required to accommodate the project is discussed in Chapter 12 (Land use and property)
  •  The project has been designed to minimise the number of additional known and potentially contaminated sites that would be impacted by the project
  •  Design optimisation included the refinement of the Rozelle interchange to reduce the impact of tunnelling through sites of contaminated fill, including at the Rozelle Rail Yards
  •  Contaminated land within the project footprint would be rehabilitated to a standard suitable for post-construction use. Potential future uses of land are described in Chapter 12 (Land use and property) and Chapter 16 (Contamination).

Waste and spoil:

  •  Reuse/recycle a minimum of 80 per cent usable spoil (uncontaminated surplus excavated material)
  •  Reuse/recycle a minimum of 80 per cent of construction and demolition waste (uncontaminated)
  •  Implement packaging take-back arrangements with suppliers (lead contractor to pass target onto sub-
  •  The project would seek to reuse or recycle at least 95 per cent of uncontaminated spoil, above the minimum target of 80 per cent as identified in the WestConnex Sustainability Strategy
  •  Usable spoil (uncontaminated surplus excavated material) would be reused and/or recycled as part of the project, where possible. A Spoil Management Strategy would be developed for the project prior to the commencement of construction and would identify spoil disposal sites and the management of excess spoil. The management and disposal of excess spoil is discussed further in Chapter 23 (Resource use and waste

Sustainability targets

Project consistency

contractors, where practical).

minimisation)

  •  At least 80 per cent of construction and demolition waste is anticipated to be reused

    and/or recycled as part of the project

  •  A Construction Waste Management Plan would be prepared as part of the Construction

    Environmental Management Plan for the project, detailing the appropriate procedures for waste management. All wastes would be managed using the hierarchy approach of waste avoidance and waste reuse before consideration of waste disposal. Resource recovery principles would be applied to the construction of the project, including recovery of resources for reuse, recycling and reprocessing, where possible. Residual waste that cannot be reused or recycled would be disposed of to a suitably licenced landfill or waste management facility.

    Additional detail regarding resource management and waste minimisation is provided in Chapter 23 (Resource and waste minimisation).

Overarching sustainability objective: Increased resilience to future climate

  •  Undertake a climate change risk assessment
  •  Identify and implement adaptation measures to mitigate all

    ‘high’ and ‘extreme’ rated residual climate change risks.

  •  An initial climate change risk assessment has been prepared as part of the environmental impact assessment for the project in line with relevant standards and current guidelines and is included in Chapter 24 (Climate change risk and adaptation)
  •  The climate change risk assessment will be reviewed and updated during detailed design and where extreme, high or medium risks are identified, a review of the design will occur. Climate change adaptation measures incorporated into this stage of the design and additional measures to manage potential climate risks are provided in Chapter 24 (Climate change risk and adaptation).

Overarching sustainability objective: Design allows for future transport needs (transport modes, extensions, access points)

Preserve an area of land for future safe pedestrian and

The project has been designed to maintain and improve pedestrian and cyclist paths

cyclist connectivity across and adjacent to the motorway
Allow for future extensions to the road network and access

points.

and connections between existing assets, and does not preclude potential future

upgrades of, or additions to, pedestrian and cyclist paths
The project would increase active transport connectivity as discussed in Appendix N

(Technical working paper: Active transport strategy), including:

  • –  Across Victoria Road, providing improved access to bus services
  • –  Across the intersection of City West Link and The Crescent, providing improved

    access to the Rozelle Bay light rail stop

  • –  Through Rozelle Rail Yards, in a north–south direction linking Easton Park and

    Bicentennial Park, and from east–west to provide connection between the

    proposed Lilyfield Road Regional Bike Route, The Bays Precinct and the CBD

  • –  A connection along Victoria Road to the existing Iron Cove active transport network

Sustainability targets

Project consistency

– New connections through the St Peters interchange (being constructed as part of the New M5 project)

  •  Future revitalisation and growth would be made possible as a result of the project reducing traffic on parts of Victoria Road, including improved local amenity, improved public transport services, upgraded active transport facilities, generation of residual land along Victoria Road and increased accessible public open space at Rozelle
  •  The Iron Cove Link masterplan and Rozelle Rail Yards masterplan are discussed in Chapter 13 (Urban design and visual amenity) and Appendix L (Technical working paper: Urban design)
  •  The Rozelle interchange would include tunnels to provide for connections to the proposed future Western Harbour Tunnel and Beaches Link, ensuring future opportunities for improved connectivity can be realised.

Overarching sustainability objective: Sustainable procurement – whole of life environmental, social and economic considerations

  •  Incorporate sustainability criteria into project contracts and tender evaluation criteria
  •  Prepare and implement an Australian Industry Participation Plan.
  •  A number of sustainability specific criteria were used in the design development for the project. Specifically, the design has been developed to consider:
    • –  How the project would meet an ‘Excellent’ rating for the Design and As-Built

      components of the project under the ISCA IS rating scheme

    • –  How sustainability initiatives would be implemented throughout the project
    • –  How sustainability targets would be achieved or improved on throughout the project
  •  A project specific Sustainability Management Plan would be prepared to guide the implementation of sustainability throughout the design and construction phases, to ensure the IS rating of Excellent is achieved (refer to Figure 27-1)
  •  An Australian Industry Participation Plan has been developed for the overall WestConnex program of works.

Overarching sustainability objective: Maximise equitable training and employment opportunities

Maximise employment and training opportunities for young

A Training Management Plan would be prepared before construction, detailing

people, disadvantaged groups, Aboriginal and Torres Strait Islanders, the unemployed, local residents and people who live in western Sydney and along the project’s alignment

  •  Provide structured training to 20 per cent of the construction workforce
  •  Provide initiatives to improve Aboriginal and Torres Strait Islander participation in construction and provide opportunities to Aboriginal and Torres Strait Islander enterprises.

initiatives to maximise employment and training opportunities (including apprenticeships/traineeships/structured training), in particular for young people, disadvantaged groups, Aboriginal and Torres Strait Islanders, the unemployed, locals and people who live in western Sydney

Sydney Motorway Corporation is in the process of developing a Reconciliation Action Plan to guide activities needed to improve outcomes for Aboriginal and Torres Strait Islander people, to align with the NSW Government’s Plan for Aboriginal Affairs, Opportunity, Choice, Healing, Responsibility, and Empowerment.

27.2.12 Additional strategic planning documents

In line with the integrated planning principles identified in the strategies above, the project has been designed with consideration of additional strategic planning documents:

  •  The NSW Freight and Ports Strategy (Transport for NSW 2013) outlines two main objectives: to deliver a freight network that efficiently supports the projected growth of the NSW economy, and to balance freight needs with those of the broader community and the environment
  •  The Parramatta Road Corridor Urban Transformation Strategy (UrbanGrowth NSW 2016) identifies WestConnex as a catalyst for the restoration of the Parramatta Road corridor and aims to guide urban renewal opportunities to create an environment with good design, land use mix, housing choice and infrastructure, as well as improved access to community facilities and services and access to public and active transport
  •  The Transformation Plan: The Bays Precinct Sydney (UrbanGrowth NSW 2015) outlines the NSW Government’s ambition for The Bays Precinct, which is intended to be staged and coordinated with the planning and delivery of WestConnex, the Inner West Light Rail line and the long term considerations of The Bays Precinct’s port uses. The project is expected to improve accessibility to the precinct, with improvements to local amenity and user experience
  •  The City of Sydney’s Sustainable Sydney 2030 Plan outlines the City’s vision for a green, global and connected city and presents 10 strategic directions for the achievement of these goals towards 2030 and beyond. The project corresponds with the City’s vision for:

 

–  Integrated transport for a connected city, with the project contributing to a reduction in traffic on some roads, and improved management of freight through Sydney as part of an integrated motorway network

 

–  A city for pedestrians and cyclists, with the project providing and facilitating improved pedestrian and cyclist connections, linking existing and proposed active transport networks, increasing publicly accessible green space and improving amenity for users

 

–  Sustainable development, renewal and design, with the project’s design developed to create improved urban design opportunities (as discussed in Chapter 13 (Urban design and visual amenity)), including a reduction in traffic which would enhance the amenity of streetscapes and create opportunities for urban renewal in some areas, such as Parramatta Road

  •  The City of Sydney currently hosts Resilient Sydney, a project to develop and implement a resilience strategy for metropolitan Sydney, as part of the Rockefeller Foundation’s 100 Resilient Cities initiative. Outcomes of the Resilient Sydney project to date include the preparation of a City Context Report (Resilient Sydney 2016a) and the development of a Preliminary Resilience Assessment (Resilient Sydney 2016b), which identifies the key shocks and stresses facing Sydney, including acute shocks such as extreme weather events and infrastructure failures (such as power outages), and chronic stresses such as a lack of transport diversity. The project’s contribution to improving Sydney’s resilience is discussed in section 27.4.2.

27.3 Infrastructure Sustainability Rating Scheme

The IS rating scheme was developed and is administered by ISCA. The IS rating scheme is a comprehensive rating system for evaluating sustainability across the design, construction and operation of infrastructure.

The project is seeking an IS ‘Design’ and ‘As-Built’ rating of ‘Excellent’ in line with the WestConnex Sustainability Strategy targets. An ‘Excellent’ rating is the second highest rating level.

Sustainability workshops and meetings were held during EIS development with planning and design teams to assess and progress initiatives for achieving IS Design and As-Built rating criteria, and sought to preserve opportunities in future detailed design development. Specific workshops were held to drive sustainable outcomes for key components of the project design, including:

  •  The M4-M5 Link tunnelling works
  • The M4-M5 Link surface works, with particular focus given to the Rozelle interchange and Iron Cove Link portals.

The workshops instigated discussion of applicable urban design initiatives and their impact on achieving project sustainability targets and requirements, with initiatives identified under the following headings:

  •  Energy and water, including initiatives for achieving efficiencies in energy and water use, as well as the management and reuse of spoil during construction
  • Access and movement, including initiatives for active transport and improved connectivity
  • Natural landscape and environment, including initiatives for the protection or provision of green space
  • Cultural heritage and identity, including initiatives for the preservation of heritage values.

A number of actions were documented for planning and design consideration to embed specific sustainability commitments and targets for implementation by the construction contractor, with requirements for regular sustainability inspections and reporting during the construction period. Commitments and targets align with those identified in the WestConnex Sustainability Strategy, outlined in Table 27-3. The construction contractor would be responsible for ensuring that enough credits are achieved to meet the IS ‘Excellent’ rating.

A project specific Sustainability Management Plan would be prepared to guide the implementation of sustainability throughout the design and construction phases, and to facilitate the achievement of the IS rating.

27.4 Ecologically sustainable development

In NSW, the commitment to the concept of environmental sustainability is expressed in current legislation. It is an object of the Environmental Planning and Assessment Act 1979 (NSW) (EP&A Act) (section 5(a)(vii)) to encourage ecologically sustainable development through the implementation of the following four principles:

  •  The precautionary principle
  • Inter-generational equity
  • Conservation of biological diversity and ecological integrity
  • Improved valuation and pricing and incentive mechanisms.

The principles of ecologically sustainable development have been an integral consideration throughout the design of the project. This includes the effective integration of the economic and environmental considerations in the decision making process, as defined by section 6(2) of the Protection of the Environment Administration Act 1991 (NSW).

The four main principles of ecologically sustainable development, including how they would be incorporated throughout the design, construction and operation phases of the project, are discussed below.

27.4.1 Precautionary principle

The precautionary principle deals with certainty in decision making. It provides that if there are threats of serious or irreversible environmental damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation.

The precautionary principle has been applied during the design and development of the project. Potential environmental impacts associated with the project were considered in the alternatives and options analysis. This included identifying opportunities to avoid and minimise surface disturbance. Refer to Chapter 4 (Project development and alternatives) for additional detail regarding the options considered as part of the project’s design.

This EIS details the evaluation of environmental impacts associated with the project. The EIS was prepared adopting a conservative approach, which included assessing the worst case impacts and scenarios. It has been undertaken using the best available technical information and has adopted best practice environmental standards, goals and measures to minimise environmental risks. The environmental assessment has been undertaken in collaboration with key stakeholders and relevant statutory and agency requirements.

 

The threat of serious or irreversible environmental damage is one of the essential preconditions to the engagement of the precautionary principle. Potential environmental risks associated with the project were identified and considered to ensure that an appropriate amount of time was afforded for detailed specialist reports as part of the environmental assessment (refer to Chapter 28 (Environmental risk analysis) for more detail). Safeguards and management measures have been developed to manage and reduce impacts identified in these assessments.

Sustainability workshops and meetings were held during EIS development with planning and design teams, which sought to preserve opportunities for the implementation of sustainability initiatives in future detailed design development. Specific workshops were held to drive sustainable outcomes for key components of the project design, as discussed in section 27.3.

27.4.2 Inter-generational equity

In broad terms, the notion of inter-generational equity refers to the premise that the present generation should ensure that the health, diversity and productivity of the environment are maintained or enhanced for the benefit of future generations.

The project tunnels would have a design life of about 100 years and would be designed to meet the needs of both current and future generations. The project has been considered in terms of inter- generational equity, with the management of potential environmental impacts discussed throughout this EIS.

As part of WestConnex, the project delivers on the NSW Government’s plans to deliver an integrated transport solution, comprising roads and public transport, to address congestion on Sydney’s roads and to cater for the diverse travel needs of Sydney’s growing population. Improvements to road infrastructure remain a critical part of the overall solution, with the project proposed to contribute to inter-generational equity through improved connectivity, reduced congestion, and facilitating urban renewal and future economic growth.

The project, as part of the WestConnex program of works, would contribute to improving Sydney’s transport network, accommodating forecast traffic growth, allowing for connections to the proposed future Sydney Gateway project (via the St Peters interchange) and proposed future Western Harbour Tunnel and Beaches Link.

By providing a motorway link between the M4 East at Haberfield and the New M5 at St Peters, the project would help to connect major employment centres, which are critical in supporting the creation of jobs and businesses. As a result, the project would improve access to employment centres for people living in western Sydney, with spatial inequality recognised as one of the key socio-economic challenges for the city. East–west connectivity and access to established and emerging employment areas in western Sydney would also improve. Improved connectivity to employment centres would include the ‘global economic corridor’, which extends from Port Botany and Sydney Airport to the Norwest Business Park and Parramatta CBD via the Sydney and North Sydney CBDs, as well as the future Western Sydney Airport at Badgerys Creek.

The project would support Sydney’s long-term economic growth through improved motorway access and connections linking Sydney’s international gateways and western Sydney and places of business across the city. With improved connectivity, the project would also enhance the productivity of commercial and freight generating land uses located near and along transport infrastructure.

The project would contribute to building the resilience of metropolitan Sydney by addressing some of the key chronic stresses facing the city, including the need for improved connectivity and reduced congestion.

The project would give consideration to redundancy in power supply through provision of back-up power for operation of the project’s essential equipment, as discussed in Chapter 5 (Project description). Additional redundancy in drainage infrastructure designed to meet or improve the capacity of existing drainage systems and account for future climate change would also be provided as part of the project, The project’s resilience to future climate change is considered in Chapter 24 (Climate change risk and adaptation), which identifies potential climate risks to the project, adaptation incorporated in the project’s design development and recommended next steps for the development of adaptation options during detailed design.

 

During construction and operation of the project, opportunities would be taken to reduce material use and maximise the use of materials with low embodied environmental impact, where practical. For example:

  •  Recycled products would be used during construction of the project to reduce the demand on resources, in instances where the use of such materials is cost and performance competitive
  •  At least 20 per cent of electricity required for construction and at least six per cent of electricity required for operation of the project would be sourced from an accredited GreenPower energy supplier
  •  Water efficiency measures would be implemented with a focus on achieving water savings and targeting water recycling and reuse, with a minimum target of five per cent of water (rainwater, stormwater, wastewater, groundwater, tunnel inflow water) proposed to be reused, recycled or reclaimed during operation of the project
  •  The project would seek to reuse or recycle around 95 per cent of uncontaminated spoil generated for beneficial purposes, either within the project or at other locations
  •  At least 80 per cent of construction and demolition waste is anticipated to be reused and/or recycled as part of the project.

The project ventilation system has been designed and would be operated so that it would achieve some of the most stringent standards in the world for in-tunnel air quality, and would be effective at maintaining local and regional ambient air quality. A large mainline tunnel cross-sectional area would permit greater volumetric air throughput and reduce the pollutant concentration for a given emission into the tunnel volume. Increased tunnel height would reduce the risk of incidents involving high vehicles blocking the tunnel and disrupting traffic, reducing the risk of higher pollutant concentrations associated with traffic flow breakdown.

Under expected traffic conditions the contribution of project tunnel ventilation outlets to pollutant concentrations was found to be negligible for all sensitive receivers identified. Exceedances of some air quality criteria were predicted to occur at a small proportion of sensitive receivers both with and without the project. However, the total number of receivers with exceedances decreased slightly with the project and in the cumulative scenarios. Where increases in pollutant concentrations at receptors were predicted, these were mostly small.

There are predicted to be substantial reductions in concentrations of criteria pollutants along Dobroyd Parade/City West Link and Parramatta Road to the southeast of the Parramatta Road ventilation facility due to traffic being diverted through the M4-M5 Link tunnel, as well as along General Holmes Drive, the Princes Highway and the M5 East Motorway. There would also be substantial reductions in pollutant concentrations along the Victoria Road corridor south of Iron Cove at Rozelle, due to traffic being diverted through the Iron Cove Link.

Some small increases in concentration of criteria pollutants were predicted to the north of Iron Cove Link and near Anzac Bridge as a result of the general increase in traffic due to the project. Pollutant concentrations were also predicted to increase along Canal Road, which would be used to access the St Peters interchange, and other roads associated with the proposed future Sydney Gateway project. Impacts associated with the proposed future Sydney Gateway project are based on a strategic concept and are therefore indicative only, would be subject to further design, as well as separate planning and approval. More detail regarding the air quality assessment is provided in Chapter 9 (Air quality) and Appendix I (Technical working paper: Air quality).

 

The project aims to reduce construction and operational greenhouse gas emissions. A greenhouse gas assessment has been undertaken to quantify emissions and identify mitigation measures to reduce emissions. The operational road use assessment undertaken as part of the greenhouse gas assessment (refer to Chapter 22 (Greenhouse gas)) notes that emissions estimated to be generated during construction and the annual emissions from the operation and maintenance of road infrastructure would be offset against emissions savings as a result of improved road performance in 2033.

Despite increases to overall daily vehicle kilometres travelled (VKT) on motorways, improvements to traffic flow and congestion are achieved through increased speeds and reduced frequency of stopping, as well as reduced daily VKT and vehicle hours travelled (VHT) on alternate routes and non-motorway roads, which results in improved fuel efficiency and subsequently reduced greenhouse gas emissions associated with road use. Further information on greenhouse gas emissions and savings is provided in Chapter 22 (Greenhouse gas).

Traffic analysis identifies a number of key benefits and improvements as a result of the project:

  •  Non-motorway roads in the Inner West local government area are forecast to experience faster trips with the daily average speed increasing by about 10 per cent. Similarly, the vehicle distance travelled on non-motorway roads is forecast to reduce by about 12 per cent. This indicates that on average, these trips are fewer in number and faster
  •  Improved network productivity on the metropolitan network, with more trips forecast to be made or longer distances travelled on the network in a shorter time. The forecast increase in VKT and reduction in VHT is mainly due to traffic using the new motorway, with reductions in daily VKT and VHT also forecast on non-motorway roads
  •  Reduced travel times are forecast on key corridors, such as between the M4 Motorway corridor and the Sydney Airport/Port Botany precinct
  •  Reduced traffic is forecast on sections of major arterial roads including City West Link, Parramatta Road, Victoria Road, King Street and Sydenham Road
  • Almost 2,000 heavy vehicles are forecast to be removed from Parramatta Road, east of the M4 East Parramatta Road ramps, each weekday.

Where the project would connect to the existing road network, increased congestion is forecast in parts of Mascot, along Frederick Street at Haberfield, Victoria Road north of Iron Cove Bridge, Johnston Street at Annandale and on the Western Distributor. A number of these areas are forecast to improve when the WestConnex program of works and the proposed future Sydney Gateway and Western Harbour Tunnel and Beaches Link project are completed. Roads and Maritime proposes to investigate the use of queuing and capacity monitoring, management of lane use and lane utilisation and ‘Smart Motorway’ operations to manage the forecast demand, where required.

A Smart Motorway uses technology to monitor, provide intelligence and control the motorway to ease congestion and keep traffic flowing more effectively. Technology, including lane use management signs, vehicle detection equipment, closed-circuit television cameras and entry ramp signals, allows road operators to manage, in real time, traffic using the motorway. Further detail regarding the scenarios modelled and the operational performance of the project is provided in Chapter 8 (Traffic and transport) and Appendix H (Technical working paper: Traffic and transport).

Notwithstanding the project benefits and the renewable energy targets that would apply, the project may have an impact on inter-generational equity through the consumption of non-renewable fuel resources during operation.

Roads and Maritime understands that it is prudent to consider that oil production may peak and then decline, which could increase the cost and reduce the availability of transport fuels and construction materials derived from oil. For transport, the solutions to the problem of ‘peak oil’ are similar to those for climate change. Alternatives to fossil fuels are needed and transport must become more energy efficient. There are moves to establish alternatives to oil as a fuel for transport and to improve energy efficiency. For example, the Australian Bureau of Statistics Motor Vehicle Census published on 31 January 2016 reports an increase in the number of hybrid and electric vehicles registered in Australia. The NSW State Transit bus fleet uses compressed natural gas to power buses (State Transit 2014), and the CBD and South East Light Rail project would include a fleet of around 30 electric-powered light rail vehicles (Parsons Brinckerhoff 2013). This would enable the economic benefits provided by road transport to continue to be delivered with a reduced need for fossil fuels.

 

Government and industry initiatives relevant to peak oil, but outside the scope of this project, include the NSW Government Resource Efficiency Policy (OEH 2014a) and the participation of Roads and Maritime, Austroads and industry in research, with the goal of developing more sustainable road construction materials and practices, thereby reducing reliance on products derived from oil.

As road transport is a significant and necessary element of the NSW economy that also provides many social benefits, Roads and Maritime would continue to ensure that all potential impacts on this system, such as peak oil, are identified and action is taken to manage these risks. Peak oil in the context of operational resource consumption is discussed in Chapter 23 (Resource use and waste minimisation).

27.4.3 Conservation of biological diversity and ecological integrity

Conservation of biological diversity and ecological integrity is a fundamental consideration of the project. The design and assessment of the project has been undertaken with the aim of identifying, avoiding, minimising and mitigating impacts.

The biodiversity study area is entirely modified and disturbed and contains exotic species, weeds and planted native or non-indigenous species. The project footprint is considered to be in a poor ecological condition, with little ecological value and unlikely to have any native resilience or recovery potential.

These facts notwithstanding, construction of the project may impact potential foraging habitat of non- native vegetation for the Grey-headed Flying-fox, Eastern Bentwing-bat and Yellow-bellied Sheathtail- bat, and may have indirect impacts on Microchiropteran bat species. However, these residual impacts are not expected to have a significant negative effect on any local populations of native biota, including any threatened fauna species that may occur in the study area.

This EIS provides a detailed biodiversity assessment, which identifies potential impacts on biodiversity, and provides a range of mitigation measures to further avoid and minimise potential impacts on biodiversity.

Potential impacts on biodiversity are detailed further in Chapter 18 (Biodiversity) and Appendix S (Technical working paper: Biodiversity).

27.4.4 Improved valuation and pricing and incentive mechanisms

Environmental factors should be included in the valuation of assets and services, including:

  •  Polluter pays (ie those who generate pollution and waste should bear the cost of containment, avoidance or abatement)
  • The users of goods and services should pay prices based on the full life cycle of costs of providing the good
  • Environmental goals, having been established, should be pursued in the most cost-effective ways.

Environmental factors have been considered throughout the concept design stage for the design, construction and operation of the project. As a consequence, environmental impacts have been avoided or minimised where practical during the design development for the project.

Mitigation measures outlined in this EIS will be implemented during construction and operation of the project. These mitigation measures would be revised and updated as required during the detailed design stage of the project and as the project passes through the assessment process.

The value placed on avoiding and minimising environmental impacts is demonstrated in the design features incorporated into the project, including opportunities for the creation of additional green space and the realignment of the mainline tunnels to avoid impacts on heritage conservation areas and heritage items (as discussed in Table 27-3), as well as the extent of environmental investigations undertaken to inform this EIS. Additionally, the costs associated with the planning and design of measures to avoid/minimise adverse environmental impacts and the costs to implement them have been included in the overall project costs.

The project creates the potential for improvements in local amenity and opportunities for urban revitalisation. Opportunities for improved urban design created by the project include the beneficial reuse of remaining land not required by the project along Victoria Road and at the Rozelle Rail Yards. Reuse and renewal of these areas would allow opportunities for future revitalisation and growth, increasing publicly accessible green and/or community space and improving access and amenity for users.

 

The Iron Cove Link masterplan and Rozelle Rail Yards masterplan are discussed in Chapter 13 (Urban design and visual amenity) and Appendix L (Technical working paper: Urban design). The project would also contribute to the delivery of the Residual Land Management Plan for the M4 East project at Haberfield and the New M5 project at St Peters, through ensuring compliance with the conditions of approval related to residual land for those projects (refer to Chapter 12 (Land use and property)).

The project would also provide improvements to pedestrian and cyclist connections, linking existing active transport networks with new connections or improving existing connections through a reduction in traffic, which would improve the amenity of streetscapes and create opportunities for urban renewal. The project would also include measures for the abatement, avoidance and/or containment of pollution and waste.

27.5 Sustainability management on the project

The overarching sustainability objectives for the project (see Table 27-3) would be met through the implementation of a Sustainability Management Plan and project specific sustainability initiatives. The implementation of these initiatives would contribute to the project achieving an IS rating of ‘Excellent’.

27.5.1 Sustainability Management Plan

While sustainability is considered throughout design, the WestConnex sustainability objectives and targets would be met through the implementation of a project specific Sustainability Management Plan and sustainability initiatives.

The construction contractor would develop and implement a Sustainability Management Plan during detailed design. The Sustainability Management Plan would establish governance structures, processes and systems that ensure integration of all sustainability considerations (vision, commitments, principles, objectives and targets), initiatives, monitoring and reporting during the detailed design and construction phases of the project.

The aims of the Sustainability Management Plan would be to:

  •  Demonstrate sustainability leadership and continuous improvement
  •  Protect and enhance the natural environment and local heritage
  •  Contribute to liveable communities and facilitate urban revitalisation by easing congestion, connecting communities and integrating land use and transport planning
  •  Optimise resource efficiency (materials, energy, water and land) and waste management
  • Increase resilience to future climate
  • Design for future transport needs
  • Procure sustainably, considering whole of life environmental, social and economic factors
  • Maximise equitable/fair training and employment opportunities.

Principles in the Sustainability Management Plan would extend across the whole project, through the detailed design, construction and operation phases. These principles would also be embedded across all management disciplines throughout detailed design and the construction contractor’s project team, ensuring that decision making processes consider environmental, social and economic costs and benefits over the life of the project.

The Sustainability Management Plan would form part of the integrated management system to be implemented on the project. The plan would be revised and updated regularly to reflect changing designs and sustainability initiatives through each of the project phases.

 

The Sustainability Management Plan would include an ISCA IS Rating Management Sub-plan to guide the achievement of an IS rating of ‘Excellent’ for the project. The Sub-plan would detail implementation protocols, including:

  •  ISCA IS assessment and registration process and timeframes
  •  Proposed consultation and engagement with ISCA and other stakeholders
  •  The IS rating process and requirements for the provision of documentation to ISCA
  •  Key sustainability management roles and responsibilities.