Flooding and drainage

Eds: This is a sample submission which focuses on flooding and drainage issues in the  Stage 3 WestCONnex. 

It’s written in the first person but you can easily change it for a group submission or use part of it for an information sheet. You can also:

  • copy and paste whole or part of this submission for your own submission or share it with others
  • use it to trigger your own ideas
  • use some it and mix it with objections on other topics relevant to the EIS ( for example Air Quality).

When you have finished drafting a submission, here’s the link to our online submission. Remember you can make as many submissions as you like. 

Submission to WestConnex New M4/M5 EIS, project number SSI 16_7485

I am object to this EIS because I believe the rushed document which has little detail risks exposing residents to serious risk.

At the western end of Bignell Lane near Pyrmont Bridge Road in Camperdown existing flood depth was identified up to one metre in the 100 year ARI. The NSW Government Floodplain Development Manual (2005) identifies this location as a high flood hazard area. For this reason I do not consider this to be an appropriate site for a dive site. I urge NSW Planning to reject this option.

 

 

 

Advertisements